Road building past camp and pit.
Another Oil Distributor used in Castor.
A failure in the cement, usually because of bad spot in the subgrade meant digging it all out usually extra deep
and putting in extra cement. And then re-oiling before Cold Mix.
This job is probably where I seen my worst rain storm. It literally washed a long stretch of soil cement off the road.
Played with a 140G on subgrade.