- Built up and hard surfaced the pads on a Dynapac padfoot.
- Replaced the pads on an 815.
- Cut off, replaced, and hard surfaced the pads on a DW-20 and built up and hard surface the tow unit.
I replaced the pads on another DW-20 at camp before the the first job of the season.
- Built small reel on a stand to roll up main power cord for camp light plant.
- Built a hitch on one ton fat deck to pull 1000 gal. water tank for camp water.
Me and an other guy also:
- Replaced the bushings on neck of tow unit for DW-20.
- Replaced tines on Selfpropell Mixer.
- Put new disk blades on two Killo-Built disks.
- Repack and replace were necessary wheel bearings and seals on probably 12 wobblys.
- Build giant reel to roll up rag hose.
- Braced frame on 40' office trailer. Also Built two mounts on roof for Aurora phone and 2 way radio antennas.
We remodeled and repainted this same trailer.