First job hired on as Graderman.
Ran mostly 140G, some 16G.
Most time was spent blading the haul road since there was something like 100 trucks hauling.
Did subgrade on soft spots, spread blasted rock on soft spots layed some gravel, dumped trucks.
This was a 60+ km job. Gravel was left bare.